AGICO EQUIPMENT PORTFOLIO
ROAD-RAIL VEHICLES
AGICO road-rail vehicles are configured for railway maintenance projects that require practical access to the worksite and task-specific work equipment. Depending on the selected machine, a vehicle can travel on the road, enter the railway at an approved access point, and work on rail under the operator’s established possession and safety procedures. This arrangement provides an access option where a conventional rail-only machine is difficult to position or where several maintenance activities must be coordinated within a planned work window.



ROAD-RAIL MAINTENANCE EQUIPMENT FOR FLEXIBLE SITE OPERATIONS
The AGICO range covers road-rail excavators and railway track machines, ballast cleaning equipment, road-rail tamping machines, and rail replacement vehicles. These equipment families serve different purposes. Some are carriers configured with task-specific tools, while others use dedicated systems for ballast excavation, track correction, or rail handling. Final mobility, work equipment, control functions, and operating limits are defined for the approved project configuration.
Railway maintenance often takes place away from depots and permanent loading facilities. Access may be available from a road crossing, a prepared trackside area, or another location accepted by the infrastructure operator. A road-rail machine can provide an alternative to rail-only positioning arrangements by approaching the work area on its road running gear and transferring to rail in a controlled location. The exact transition method depends on the vehicle layout, ground conditions, track geometry, and local operating rules.
Depending on the approved vehicle, on-track movement can involve selected rail guidance, traction, and braking components. The working system is then configured for the assigned task. This does not make every road-rail vehicle suitable for every route. Gauge, loading gauge, permissible axle load, curve conditions, gradients, structures, overhead equipment, and work-zone restrictions all need to be reviewed before a machine is selected.
For contractors and maintenance departments, the practical value lies in matching one equipment platform to a defined sequence of work. A railway track machine may handle sleepers during one operation and perform local ballast work with another attachment. A dedicated tamper, by contrast, is chosen when controlled track geometry work is central to the scope. AGICO therefore starts configuration discussions with the maintenance method, route conditions, and required work tools rather than treating road-rail mobility as a complete specification by itself.
AGICO ROAD-RAIL VEHICLE RANGE
The four equipment families below are complementary rather than interchangeable. The appropriate choice depends on the material to be moved, the track component to be handled, the required work sequence, and the level of dedicated railway functionality needed.
| Equipment family | Primary function | Typical work scope | Main configuration focus |
|---|---|---|---|
| Road-rail excavator and railway track machine | Multi-purpose trackside and on-track work | Sleeper handling, local ballast excavation, shaping, and track-bed preparation | Carrier, rail gear, work envelope, attachment interface, and selected tools |
| Rail ballast cleaning machine | Removal and controlled transfer of ballast from beneath or around the track structure | Undercutting, ballast excavation, screening or separation, discharge, and supporting ballast work | Cutting arrangement, material flow, discharge method, guarding, and site clearance |
| Road-rail tamping machine | Consolidation of ballast and correction of track position | Tamping with project-specific lifting, lining, leveling, and sensing functions | Tamping layout, track geometry system, turnout requirements, and route conditions |
| Rail replacement vehicle | Handling, loading, unloading, transport, and positioning of rail | Local rail replacement or coordinated rail exchange logistics | Rail length, lifting plan, vehicle composition, crane or attachment arrangement, and access |

ROAD-RAIL EXCAVATOR AND RAILWAY TRACK MACHINE
A road-rail excavator combines an excavator-type working platform with equipment for operation on or around railway track. The carrier can be matched with a work tool selected for the maintenance task, provided that the attachment, hydraulic interface, stability, clearance, and rail operating arrangement are reviewed together.
For sleeper work, a suitable handling attachment can grip and position the component during removal or installation. Ballast buckets, sieve buckets, rakes, scrapers, and other tools may be considered for ballast distribution, local excavation, shoulder work, or track-bed preparation. Availability is configuration-dependent, and a tool shown for one reference machine should not be assumed to fit another carrier without engineering confirmation.
RAIL BALLAST CLEANING MACHINE
Ballast condition influences drainage, load distribution, and the ability to maintain track geometry. A rail ballast cleaning machine is intended to remove fouled or displaced ballast from a defined part of the track structure and transfer the material for screening, discharge, or removal according to the chosen maintenance process.
In an undercutting arrangement, the cutting equipment is positioned to excavate ballast below the sleepers. The recovered material is carried through the machine’s transfer path and directed to the specified discharge point. The working depth, cutting geometry, effective reach, material flow, and discharge side must be selected for the track layout and the planned ballast treatment. Guarding, rail guidance, carrier support, and clearances around sleepers, rails, structures, and adjacent equipment also form part of the configuration review.


ROAD-RAIL TAMPING MACHINE
A road-rail tamping machine consolidates ballast beneath and around sleepers so that the track can be supported in its intended position. It is used after activities such as ballast intervention, sleeper work, local track repair, or other operations that disturb the supporting ballast. The machine’s role is distinct from ballast cleaning: cleaning addresses ballast condition and material flow, while tamping compacts and redistributes ballast in the sleeper support zone.
Depending on the approved configuration, a tamper may combine tamping units with track-position sensing and functions for lifting, lining, or leveling. These systems must be selected as one coordinated arrangement. The number and movement of tamping tools, their suitability for plain line or turnout areas, and the control method are model-specific. Where turnout work is required, lateral tool movement or repositioning provisions can be discussed, but the available envelope must be checked against the actual track layout.
RAIL REPLACEMENT VEHICLE
Rail replacement requires controlled handling of long, heavy components within a narrow railway worksite. AGICO can discuss equipment arrangements for loading, unloading, transporting, picking up, and positioning rails as part of a planned replacement process. The suitable solution depends on whether the project involves isolated short sections, repeated local replacements, or a coordinated renewal operation over a longer work zone.
For local work, a railway maintenance carrier equipped with a suitable rail-handling attachment may support the removal or placement of a defined rail section. For larger handling scopes, a dedicated arrangement can use railway flat cars with crane or gantry equipment to transport and transfer rails. These are different equipment concepts. An attachment-based machine should not be treated as equivalent to a multi-vehicle rail-handling consist, and the final composition should follow the lifting plan and site method.

DESIGN FEATURES FOR ROAD AND RAIL OPERATION
Road-rail equipment brings two operating environments onto one platform. On the road, the selected chassis, axles, steering, crawler gear, or transport arrangement must suit the access route and local requirements. On track, the rail guidance and running system must match the confirmed gauge and interface correctly with the carrier. Traction and braking behavior, transition procedure, travel direction, and permissible operating conditions are established for the selected machine rather than generalized across the range.
The working system is equally important. Excavator-based machines depend on the carrier hydraulics, attachment connection, stability, and tool controls. Ballast undercutting equipment adds cutting, transfer, discharge, and guarding considerations. Tamping equipment requires coordinated tamping and, where selected, track-position control functions. Rail-handling vehicles need a defined lifting and securing arrangement. AGICO reviews these systems as an integrated configuration because changing one attachment or work method can change clearance, balance, control, and support requirements.
Operator visibility and work-zone communication should be addressed in the project specification. Depending on the machine and operating environment, selected provisions may include braking arrangements, position or height limiting devices, cameras or other monitoring equipment, warning devices, insulation measures, and emergency-power arrangements. Their inclusion, location, and operating logic need technical confirmation. They do not replace the infrastructure operator’s possession rules, competent personnel, site protection, exclusion zones, or pre-work inspection procedures.
APPLICATIONS IN RAILWAY MAINTENANCE
Road-rail vehicles can support planned maintenance, renewal preparation, and local corrective work where their access and work envelopes suit the route. Excavator-based machines are relevant to sleeper handling, localized ballast excavation, shoulder shaping, and track-bed preparation when the correct tool and carrier arrangement are selected. For projects that include bush clearing beside railway lines, a machine may be configured with the documented bush-cutting attachment; this scope is attachment- and project-specific.
An approved sieve-bucket configuration can support ballast backfilling, filling at sleeper ends, distribution, screening, and collection. Carrier compatibility and the work method require project-specific confirmation. Ballast equipment can also be configured for under-sleeper excavation, local cleaning, scraping, redistribution, and the transfer of recovered material. Tamping machines address ballast consolidation and track-position work after the supporting bed has been disturbed or renewed. Rail replacement equipment supports the logistics of collecting, transporting, unloading, and positioning rail for the installation team.

EQUIPMENT SELECTION AND PROJECT CONFIGURATION
Selection begins with the railway, not the catalog. AGICO asks for the track gauge, rail and sleeper arrangement, loading gauge, permitted axle loads, route curvature, gradients, and the clear work envelope. The review should also identify platforms, bridges, tunnels, crossings, overhead equipment, signaling assets, and any location where the machine must enter or leave the track.
The work scope then defines the equipment. Buyers should describe the material or component to be handled, the sequence of operations, the required attachment, the desired discharge or set-down location, and the support vehicles available. For ballast work, information about contamination, excavation limits, drainage, and material disposal is useful. For tamping, the track layout and intended geometry work must be clear. For rail replacement, rail sections, lifting points, storage or transport method, and installation sequence need to be identified.
Road transport limits, ground bearing conditions at the access point, climate, dust, temperature, precipitation, altitude where relevant, and storage conditions may influence the proposed configuration. Local railway rules, operator acceptance procedures, inspection requirements, language for manuals and labels, and training expectations should be supplied early. Final technical data is issued against the agreed configuration rather than inferred from a reference machine.
QUALITY CONTROL AND LIFECYCLE SUPPORT
AGICO’s project process can include technical clarification, configuration review, and confirmation of the agreed equipment scope before manufacture or supply. Drawings, equipment lists, interface information, and inspection documents are prepared as applicable to the contract. Where buyer inspection or defined acceptance activities are required, the scope and records should be agreed in the order documentation.
Commissioning assistance and operator or maintenance training can be discussed for the selected equipment and destination. The content, location, language, and division of responsibilities are project-specific. Spare-parts planning should consider wear tools, attachment components, filters, hydraulic items, rail running parts, and other service items relevant to the final machine. Recommended inspection and maintenance information can be included in the agreed documentation package for that configuration.
Long-term equipment planning also benefits from accurate operating records. Recording work hours, attachment use, observed wear, inspections, and parts replacement helps the owner plan maintenance and communicate clearly when technical support is needed. Support availability and response arrangements are confirmed in the contract for each order.
FREQUENTLY ASKED QUESTIONS
Can a road-rail vehicle enter the track at any location?
No. The transition point must suit the machine’s road and rail running arrangement, ground support needs, track geometry, and clearance envelope. It must also be accepted under the infrastructure operator’s access, possession, and safety procedures.
Can AGICO configure equipment for different track gauges?
Gauge is a primary project input. AGICO reviews it together with rail profile, route clearance, axle-load limits, curves, and the selected carrier. Compatibility is confirmed for the offered configuration; it should not be assumed from a reference machine.
Which attachments can be used on a road-rail excavator?
Possible work tools include sleeper-handling equipment, ballast buckets, sieve buckets, rakes, and scrapers. The carrier interface, hydraulic demand, stability, working radius, transport position, and route clearance must be checked before an attachment is approved.
Is a ballast cleaning machine the same as a tamping machine?
No. Ballast cleaning equipment excavates and transfers ballast for treatment, redistribution, or removal. A tamper consolidates ballast in the sleeper support area and may include configured lifting, lining, leveling, or track-sensing functions. A maintenance plan may use both, but they perform different stages of the work.
How is rail replacement equipment selected?
The selection depends on rail section length, lifting and transfer method, route access, work-zone layout, and the wider replacement sequence. A local rail-handling attachment may suit a limited task, while a larger scope may require flat cars and dedicated crane or gantry equipment.
What information is needed for a quotation?
Provide the route and country of operation, track gauge, loading and axle-load limits, access method, work scope, site constraints, required attachments, climate, local acceptance requirements, and preferred delivery documentation. Photos, drawings, track layouts, and a draft method statement can help clarify the equipment boundary.
CONTACT AGICO
To discuss an AGICO road-rail vehicle, submit your project requirements with the route conditions, gauge, maintenance task, access point, work envelope, and required attachments. AGICO will review the information and identify the technical points that must be confirmed before a configuration and quotation are prepared.