DC-32 Railway Tamping Machine

Ballasted track maintenance equipment

DC-32 Railway Tamping Machine

A step-by-step double-sleeper ballast tamper for restoring track geometry and compacting ballast during railway construction, overhaul and maintenance.

VIEW TECHNICAL DATA

DC-32 railway tamping machine on ballasted track in a maintenance depot

Coordinated geometry correction
Measurement, lifting, lining, leveling and 32-tool tamping equipment operate in one maintenance sequence.

63 tApproximate weight

269 kWEngine power

100 km/hMax. self-propelling speed

32Tamping tools

Side view of the DC-32 railway tamping machine and underframe tamping equipment

Product introduction

Track correction and ballast compaction in one machine

The DC-32 railway tamping machine is designed for ballasted railway track construction and maintenance. It measures the existing geometry, lifts and lines the track, corrects longitudinal level and alignment, and compacts ballast beneath the sleepers. The machine works in a step-by-step cycle and tamps two sleepers at a time, allowing several related maintenance operations to be completed in one pass.

Its working equipment includes a three-chord measuring system, lifting and lining devices, leveling controls and 32 straight tamping tools. The machine may be used in three-point or four-point inspection mode according to the selected work method. A 269 kW engine and hydro-mechanical drive support self-propelled travel at up to 100 km/h, while the working speed is adjustable from 0 to 3 km/h.

Advantages and features

Functions arranged for repeatable track work

01

Double-sleeper tamping

Thirty-two straight tools tamp two sleepers in each working cycle. Paired tools enter the ballast on both sides of the sleeper and apply high-frequency vibration and squeezing force to form a compact support beneath the track.

02

Measurement-based correction

The three-chord system supplies the reference for track lifting, lining and leveling. Three-point or four-point inspection can be selected to suit the required correction method and the established maintenance procedure.

03

Integrated control functions

Electro-hydraulic servo control combines automatic detection, computer control and fault monitoring. Dual-machine backup helps maintain control availability, while diagnostic information supports inspection and troubleshooting.

04

Travel and working transmission

The hydro-mechanical drive supports transfer between work sites and controlled low-speed movement during tamping. Travel and working speeds are selected separately for the relevant operating condition.

Three-quarter view of the DC-32 ballast tamper with lifting and lining equipment

Tamping and measurement system

Controlled lifting, lining and ballast support

During a working cycle, the measuring system identifies the required correction and the lifting and lining device moves the track toward the reference position. The tamping units then penetrate the crib ballast and compact material beneath two adjacent sleepers. Sleeper-end consolidation can be carried out as part of the same maintenance sequence.

Effective tamping depends on suitable ballast condition and adequate material around the sleeper. The machine should not be used as a substitute for ballast renewal where ballast is severely deficient, cemented material prevents the tools from reaching below the sleeper base, or unresolved mud pumping prevents stable support.

Technical parameters

DC-32 reference specifications

ModelDC-32
Approximate weight63 t
Wheelbase1,800 mm
Distance between bogie pivot centers11,500 mm
Wheel diameter840 mm
Engine power269 kW
Drive modeHydro-mechanical drive
Maximum self-propelling speed100 km/h
Minimum curve radius for travel120 m
Working speed0–3 km/h
Minimum curve radius during work120 m
Number of tamping tools32 straight tools
Tamping modeStep-by-step, double-sleeper tamping
Measuring systemThree-chord system; three-point or four-point inspection
ClearanceGB 146.1 standard-gauge railway rolling-stock and locomotive clearance

Specifications are reference values. Final configuration, interfaces and operating limits are subject to the confirmed project specification and target railway requirements.

DC-32 ballast tamper operating on a ballasted railway line

Applications

For track construction, overhaul and routine correction

New ballasted track construction

Used after track placement and ballast distribution to establish the required level and alignment and consolidate support beneath the sleepers.

Post-cleaning and overhaul

Restores track geometry after ballast cleaning, ballast renewal or other major maintenance that disturbs the sleeper support condition.

Corrective and routine maintenance

Corrects local settlement, alignment and longitudinal-level deviations on compatible ballasted routes within the specified curve radius and operating envelope.

Discuss your track maintenance duty

Share the route type, sleeper spacing, ballast condition, required geometry corrections, minimum curve radius and possession plan. AGICO can review the suitable machine configuration and project interfaces.

REQUEST A TECHNICAL PROPOSAL

Scroll to Top