Track · catenary · infrastructure
Railway Maintenance Vehicles
Purpose-built equipment for track geometry correction, track renewal, overhead-line installation and maintenance, road-rail work and railway bridge construction.

6 equipment routesFrom tamping to bridge erection
Available maintenance vehicles
Select by maintenance task
Each product page describes a defined vehicle or equipment family. Select the work package below to review the applicable machine, working functions and reference specifications.

DC-32 Tamping Machine
Double-sleeper tamping equipment for measuring, lifting, lining, leveling and compacting ballasted railway track.

Track Renewal Train
Integrated equipment for removing old track material, handling rails and sleepers, and supporting continuous renewal work.

Road-Rail Vehicles
Multi-purpose vehicles that combine road mobility with rail guidance for excavation, ballast work, material handling and support duties.

Catenary Wire Laying Vehicle
A rail-mounted installation wagon for controlled payout of contact wire and messenger wire from multiple cable drums.

Catenary Maintenance Vehicle
A self-propelled vehicle with work platform and folding crane for overhead-line inspection, installation, repair and routine maintenance.

Bridge Girder Erection Machine
Specialized railway construction equipment for transporting, positioning and erecting precast bridge girders along the alignment.
Equipment overview
Six routes across the maintenance program
Work package
Primary equipment
Typical function
Details
Selection guidance
Match the equipment to the worksite
A useful equipment review starts with the maintenance method, route constraints and planned working window. The vehicle type should be matched to the actual task rather than selected from travel speed or engine rating alone.
01
Define the task
Renew, correct, inspect, install or handle.
02
Confirm the route
Gauge, curve radius, axle load and clearance.
03
Review the method
Required output, interfaces and possession plan.
04
Check site conditions
Ballast, access, power supply and infrastructure limits.

Project preparation
Information to confirm before selection
Required work sequence
Define the correction, installation, handling or renewal operations to be completed.
Route and clearance limits
Provide track gauge, minimum curve radius, axle-load limits and structure clearance.
Planned working window
Share possession time, expected output, transfer requirements and operating cycle.
Project interfaces
Confirm couplings, braking, work attachments, material supply and local operating rules.
Project selection support
Discuss your maintenance program
Share the route, work package, maintenance method and operating constraints. AGICO can review the suitable equipment family and project interfaces.